Project Description

Using the same site as the previous bank building required careful demolition to remove the WaFed’s original building without damaging adjacent structures. Limited space on site created interesting challenges for drainage and building construction. Express Construction was the general contraction on this project. Kugel Construction was hired to complete the demolition, excavation, grading, utilities, and concrete work.